Office of Design and Construction Project Updates

« September 2017 »
Tuesday September 12

West bound 19th Street - Closed between Elm and US 6 on Wednesday 9/13/17

The City of Golden announced they will be closing west bound 19th Street, between Elm and US 6. on Wednesday, 9/13 from 9:00am - 12noon. The purpose of ...

«  September 2017  »
S M T W T F S
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30

News (09/12/17)

West bound 19th Street - Closed between Elm and US 6 on Wednesday 9/13/17

  • The City of Golden announced they will be closing west bound 19th Street, between Elm and US 6. on Wednesday, 9/13 from 9:00am - 12noon. The purpose of ...

ODC Directory

Office of Design and Construction
1801 19th Street
Golden, CO 80401
Main (303)273-3568
ODC@mines.edu

Mike Bowker, PE

Director, Office of Design and Construction

(303)384-2034

mbowker@mines.edu

 

Clay Bosworth 

Project Manager

(303) 273-3338

ncbosworth@mines.edu

 

Eryn Donnelly

Project Manager

(303) 384-2535

edonnelly@mines.edu

Robert Lee, AIA

Architect

(303) 384-2519

ralee@mines.edu

 

Susan Miner, AIA

Architect

(303) 384-2517

sminer@mines.edu

 

Mike Ray

Building Audit

(303) 273-3397

mrray@mines.edu

 

 

 

Chris Cocallas, AIA

Executive Director, Capital Planning and Design

University Architect

(303) 273-3920